Know the impact before, during and after a flood.
Increased staff safety
Prevent damage to assets
Improved decision making
Reduce
lost production
Better preparation and recovery outcomes using hyper local, real time information.
What's available now.
"Are we going to be affected, where and how?"
What's possible.
Pit 100 is likely to be inundated in 10 hours.
"What can we do with the time we have?"

Your Return on Investment
-
Improved safety and reduced flood-related incidents.
-
Gained hours or days of reduced business interruption with proactive actions and increased recovery time during and post event from efficient and hyper-localised pre-planning.
-
Minimise extensive field crew mobilisation for physical damage surveys.
-
Efficient and reduced resourcing costs.
-
Effective and efficient water routing to sacrificial pit to minimise business interruption.
-
Efficient water management.
-
Loss prevention through securing sites and assets such as moveable fleet vehicles and machinery.
Generate millions in operational efficiency and minimised business interruption.
Rapid and granular flood information for every stage of an event.
Have the best possible flood preparation, response and recovery plans using the best data.

Asset 301 is likely to be inundated in 8 hours.
Staff require evacuation in 3 hours
Washout along road expected in 3 hours

Location-specific flood forecasts
Efficient route and logistics planning
Greater situational awareness
Immediate impact estimation