Image by Bence Balla-Schottner

Flood impact insights for Mining & Energy

Increase revenue with better O&M efficiency, optimised pre-planning and minimised safety risks with FloodMapp.

"These rapid inundation map updates give us the foresight to know where and what assets need to be relocated to prevent losses and minimise business interruption"

~ Emergency and Asset Manager

Know the impact before, during and after a flood.

Increased staff safety

Prevent damage to assets

Improved decision making

Reduce
lost production

Better preparation and recovery outcomes using hyper local, real time information.

What's available now.

"Are we going to be affected, where and how?"

What's possible.

Pit 100 is likely to be inundated in 10 hours.

"What can we do with the time we have?"

Image-floods-1.jpg

Your Return on Investment

  •  Improved safety and reduced flood-related incidents.
     

  • Gained hours or days of reduced business interruption with proactive actions and increased recovery time during and post event from efficient and hyper-localised pre-planning.
     

  • Minimise extensive field crew mobilisation for physical damage surveys.
     

  • Efficient and reduced resourcing costs.
     

  • Effective and efficient water routing to sacrificial pit to minimise business interruption.
     

  • Efficient water management.
     

  • Loss prevention through securing sites and assets such as moveable fleet vehicles and machinery. 

Image by jim gade

Generate millions in operational efficiency and minimised business interruption. 

Rapid and granular flood information for every stage of an event.

Have the best possible flood preparation, response and recovery plans using the best data.

Screen Shot 2020-06-22 at 3.14.56 pm.png

Asset 301 is likely to be inundated in 8 hours.

Staff require evacuation in 3 hours

Washout along road expected in 3 hours

Screen Shot 2020-07-03 at 12.25.38 pm.pn

Location-specific flood forecasts

Efficient route and logistics planning

Greater situational awareness

Immediate impact estimation